Impact windows in Lauderdale-by-the-Sea, FL are permitted by the Town Building Division at Town Hall, with services run by CAP Government. The Town is in Broward's High Velocity Hurricane Zone at 170 mph for a typical home, its window packet places the Town in Exposure D, and beach-facing glass must meet a 0.45 light-transmission limit.
Last checked: November 5, 2026 · General guidance. Confirm requirements for your address with the building department that serves Lauderdale-by-the-Sea.
A barrier island where most homes are in tall buildings
Lauderdale-by-the-Sea sits on a barrier island about 1.5 square miles in size, with the Atlantic Ocean on one side and the Intracoastal Waterway on the other. Fort Lauderdale lies to the south and Pompano Beach to the north. The Town lists its elevation at 7 feet above sea level, and coral reefs sit about 100 yards off the beach.
The housing is unusual even for the coast. The Census Bureau's 2020–2024 estimate counts 6,900 housing units, and about 56 percent of them are in buildings with 50 or more units. Only about 15 percent are detached houses. Roughly 46 percent of all units are held for seasonal or occasional use, which fits the Town's own numbers: about 6,200 year-round residents and a peak seasonal population near 12,000.
That mix shapes almost every window project here. Many owners are in an oceanfront condo, may be out of state for part of the year, and answer to a board before they answer to the Town. The sections below cover what is specific to this Town: wind exposure, turtle glass, condo rules, the permit packet and the storm record.
Quick facts for Lauderdale-by-the-Sea window projects
A one-page summary from the Town's own documents and state and county code. Confirm anything tied to your exact address with the Building Division.
| Item | What the sources show |
|---|---|
| Permit office | Town Building Division, Town Hall, 4501 North Ocean Drive; permit and inspection services provided by CAP Government, Inc. |
| Contact | (954) 640-4215, building@lbts-fl.gov; inspections lbtsinspections@capfla.com |
| Online systems | CitizenServe permit submittal and search, Broward County e-Permits, CAP Online portal for inspections |
| High Velocity Hurricane Zone | Yes. FBC 2023 defines the HVHZ as Broward and Dade counties |
| Design wind speed | 170 mph (3-second gust), Risk Category II, FBC 2023 Section 1620.2 |
| Wind exposure | Exposure D, per the Town's window and door permit sheet |
| Beach-facing glass | Visible light transmittance of 0.45 or less where the unit can be seen from the beach |
| Window inspections | Bucks, windows/doors in progress, final windows/doors |
| Completion limit | Exterior work under a permit finished within six months of the first permit, Town Code Section 6-12 |
| Condo safety inspections | Broward program at 25 years from certificate of occupancy, then every 10 years |
Exposure D: why wind loads run higher on this shoreline
Every Broward address uses the same design wind speed: 170 mph for a Risk Category II building under FBC 2023 Section 1620.2. What changes from place to place is exposure. Section 1620.3 treats HVHZ sites as Exposure C unless the more severe Exposure D applies, and open water is what triggers D.
The Town settles the question on its own permit sheet for windows, shutters and doors. It requires wind load calculations signed and sealed by an engineer and states that the Town is located within Exposure D. The Broward voluntary wind load chart, which many inland homeowners rely on for small retrofits, is printed in the same packet with a warning that it is not for use in coastal Exposure D areas.
In practice, that means an engineer's calculation for every project, and pressures that are often higher than for an identical opening inland. Corner openings matter most. The Town defines Zone 5 as any opening within the corner distance of the building, and its opening schedule asks you to mark each window as Zone 4 or Zone 5.
Product testing follows the HVHZ rules. Under FBC 2023 Section 1626.2, the large missile test fires a timber missile at three specimens at 50 feet per second. The Town's packet then asks for the product approval with the relevant sections highlighted, so the reviewer can compare each product's tested pressure with what each opening needs.
Turtle glass: the 0.45 rule for openings that face the beach
This is the requirement most likely to surprise a new owner. The Town's window packet includes a Turtle Requirements form with one question: can any part of the dwelling unit be seen from the beach?
If the answer is yes, every window and door within line of sight of the beach must be tinted glass with a visible light transmittance of 0.45 or less. That covers the seaward side and the sides perpendicular to the shore, not just the wall that faces the water. You must submit documented proof that the glass meets the value, and both the owner and the contractor sign the form.
Choose the glass before you order. A clear laminated unit that would pass inland can fail here, and the Town's opening schedule has a column for the light transmittance of every opening, next to U-factor and SHGC. Oceanfront owners should also expect the energy paperwork: the packet asks for insulation and fenestration documents that comply with FBC Energy R401 or C401.
Oceanfront condos: the board, the 30-foot line and the 25-year inspection
With about two thirds of local units in buildings of 20 or more, the condo association usually comes first. Many boards set one approved product, frame color and glass for the whole building. The Town's packet includes a notarized affidavit in which the owner names the homeowners association whose approval may be required and accepts responsibility for any added cost if that approval is skipped.
Height adds engineering. Broward's Formal Interpretation #24, printed in the Town's packet, says buildings over 30 feet need a signed and sealed site-specific design listing every retrofit opening and its pressure. Generic charts are not accepted above 30 feet. The same interpretation lets a Florida engineer or architect modify the buck or fasteners shown in a Notice of Acceptance, which helps with older concrete openings.
Multi-family and commercial parcels also go to the Fire Department for review, according to the Town's sheet.
Older buildings are on an inspection clock as well. Florida Statute 553.899 requires milestone inspections of condo and co-op buildings three or more habitable stories tall at 30 years, and lets a local agency move that to 25 years based on local conditions, including proximity to salt water. Broward's Building Safety Inspection Program, Policy #05-05, already inspects at 25 years from the certificate of occupancy and every 10 years after, includes balconies and guardrails, and gives owners 180 days from the report to finish required repairs. With a median build year of 1972, many towers here are well past that mark.
Bel-Air, Terra Mar Island, Silver Shores and the single-family streets
Houses are a minority, but they are concentrated in named neighborhoods. Town documents list Bel-Air and Terra Mar, Lauderdale Surf & Yacht Estates, North Silver Shores, South Silver Shores and South Seagrape. Bel-Air was unincorporated Broward County until the Town annexed it in 2001, and both Bel-Air and Terra Mar Island have their own civic associations. In fiscal 2024 the Town replaced the Bel-Air seawall, which had begun to fail.
The building stock is old. The 1960s are the largest decade, at about 33 percent of units, followed by the 1970s at about 27 percent. About 73 percent of units were built before 1980, decades before the 2023 code and its impact test rules. Openings that come up most often:
- Sliding glass doors to balconies and terraces in towers, where height pushes the required pressure up
- Large fixed picture windows facing the ocean or the Intracoastal, which must also meet the 0.45 turtle limit if the beach can see them
- Single-hung and horizontal roller windows in 1950s and 1960s houses on the canal streets
- Corner windows, which fall in Zone 5 on the Town's opening schedule
- French doors and patio doors to pool decks and docks behind waterfront homes
What the Town's window packet asks for
The Town runs its own Building Division at Town Hall, with plan review and inspections provided by CAP Government. Florida requires a permit to replace windows and exterior doors, and the Town's Minimum Permit Requirements sheet is direct: without the minimum documents, the application is not accepted. Documents are submitted in duplicate.
The list includes a permit application that is complete, signed and notarized; proof of job valuation; the Broward County Property Appraiser's valuation of the building; a Notice of Commencement when the job is above the value on the form; a plan showing every opening; a window schedule; sealed wind load calculations; highlighted product approvals; and the energy and turtle documents. The Notice of Commencement must be recorded and posted on the job site before the first inspection.
Applications move through CitizenServe and Broward County e-Permits. Inspections are requested through the CAP Online portal or by email. The Town's inspection sheet lists bucks, windows and doors in progress, and final windows and doors. Requests made before 3:00 PM get a next-day inspection, and you call before 9:00 AM that day for a time window. Fees are set by Resolution 2026-25.
Two Town rules affect scheduling. Under Town Code Section 6-12, the exterior part of a permitted repair or renovation must be finished, and debris removed, within six months of the first permit. And under the Broward administrative provisions printed in the packet, a hurricane watch from the National Weather Service is enough notice to secure the site and protect all glass areas. Plan around hurricane season.
Wilma, Irma, storm surge and the 50 percent rule
Federal storm reports measure the coast just north and south of the Town. During Hurricane Wilma on October 24, 2005, the Pompano Beach Airport station stopped reporting at a 72-knot sustained wind. The National Hurricane Center concluded parts of Broward likely had Category 2 conditions, and that upper floors of high-rise buildings felt stronger wind than ground stations recorded. That point matters on a barrier island of towers. Broken windows were on the damage list.
Hurricane Irma in September 2017 brought a 97-knot gust at Deerfield Beach and 2 to 4 feet of inundation above ground along coastal parts of northern Miami-Dade, Broward and Palm Beach counties. A sensor on a canal in neighboring Pompano Beach recorded water at 3.4 feet NAVD88.
Flood rules can reach a window job. The Town's elevation certificate service describes the 50 percent rule: a building in a flood zone that is damaged or improved beyond half its market value must be raised to the current required height. Large renovations that bundle windows with other work should be checked against it. Public Works provides elevation certificates free, but the Town has kept them for new construction only since February 2008. Flood maps are on the Town website, and Florida DEP publishes a map of the Coastal Construction Control Line for oceanfront parcels.
What a Lauderdale-by-the-Sea window project looks like
In brief: association approval if you are in a condo or HOA, a measurement visit, an engineer's Exposure D calculation, glass chosen for pressure and for the turtle limit where it applies, the Town packet, installation, and inspections through permit close. The installation price table on this page lists labor by opening size. Product price is quoted separately by brand, series and size, and current factory pricing by size is on the Windows Stock Market instant price tool.
Materials typically arrive 2–3 weeks after contract for in-stock projects. No date is promised, because Town review and board schedules vary, and the six-month completion rule starts with the first permit. Afterward, a wind mitigation inspection (form OIR-B1-1802) can document your opening protection for your insurer. If you spend winters elsewhere, plan the work around when you can be reached for approvals.
Working with Vieser Construction in Lauderdale-by-the-Sea
Vieser Construction is an authorized installer for ESW, Mr. Glass and PGT. We coordinate your complete installation from measurement to final inspection.
Permit assistance is available. Our team coordinates the complete permitting process, including required documentation, engineering and permit submission, when applicable.
Before you call or text, note whether your home is a house, townhouse or condo unit, how many stories the building has, whether any glass can be seen from the beach, and your association's window rules. Those four answers decide the engineering, the glass and the approvals.
Lauderdale-by-the-Sea neighborhoods we serve
Bel-AirTerra Mar IslandLauderdale Surf & Yacht EstatesNorth Silver ShoresSouth Silver ShoresSouth Seagrape
Installation price per opening in Lauderdale-by-the-Sea
Installation is priced per opening, by the opening’s largest side. Doors are priced per panel. These are installation-only rates, plus 7% sales tax. The windows and doors themselves are quoted separately, line by line, by brand, series and size. Permit fees are set by the city and listed separately.
| Opening | Installation | Unit |
|---|---|---|
| Window, largest side up to 74″ | $200 | per window |
| Window, largest side over 74″ up to 96″ | $230 | per window |
| Window, largest side over 96″ | $250 | per window |
| Any door (sliding glass, French, entry, swing) | $300 | per panel |
| Mullion (joint between two units) | $50 | each |
Openings above the second floor are quoted after a site visit.
Impact windows in Lauderdale-by-the-Sea: questions we hear
Who issues window permits in Lauderdale-by-the-Sea?
The Town's Building Division at Town Hall, 4501 North Ocean Drive. CAP Government, Inc. provides permit and inspection services for the Town. Applications go through CitizenServe or Broward County e-Permits, and inspections are requested through the CAP Online portal or by email. The Building Division number is (954) 640-4215.
How much does impact window installation cost in Lauderdale-by-the-Sea?
See the installation price table on this page. Installation is priced per opening based on the opening's largest side, and doors are priced per panel. The windows and doors themselves are quoted separately by brand, series and size. Permit fees are set by the Town under its fee resolution and are separate from the installation price.
What is the turtle glass rule in Lauderdale-by-the-Sea?
If any part of your unit can be seen from the beach, every window and door within that line of sight must have tinted glass with a visible light transmittance of 0.45 or less. That includes the seaward side and the sides perpendicular to the shore. The Town requires documented proof of the value and a signed turtle requirements form.
Why does my project need an engineer's wind load calculation?
The Town's window permit sheet places Lauderdale-by-the-Sea in Exposure D and requires wind load calculations signed and sealed by an engineer. The Broward voluntary wind load chart is marked not for use in Exposure D areas. Buildings over 30 feet also need a sealed site-specific design listing every opening's pressure.
Can I replace the windows in my oceanfront condo myself?
Start with your association. Many buildings set one approved product, and the Town's packet includes an affidavit naming the association whose approval may be required. Multi-family parcels also get Fire Department review. If the building is over 30 feet, Broward requires a signed and sealed site-specific design for each retrofit opening.
Can Vieser help with the Lauderdale-by-the-Sea permit paperwork?
Yes. Permit coordination is available for qualifying projects. Our team manages the required documentation, engineering coordination and submission process from start to finish. Tell us whether any glass can be seen from the beach and how tall your building is, since both change what the Town asks for.
Related
- See current factory pricing by window size (ESW, Mr. Glass)
- Impact windows and doors: material price guide
- Impact windows across Broward County
- Impact doors
Planning impact windows in Lauderdale-by-the-Sea? We coordinate your complete installation from measurement to final inspection.
Call (754) 707-3281 or request an estimate.
Sources: Town of Lauderdale-by-the-Sea: Town Facts · Town of Lauderdale-by-the-Sea: Annual Comprehensive Financial Report FY2024 · Town of Lauderdale-by-the-Sea: Building Division · Town of Lauderdale-by-the-Sea: Windows, Shutters and Garage Doors permit packet · Town of Lauderdale-by-the-Sea: Building Forms & Documents · Town of Lauderdale-by-the-Sea: Online Building Permit Submittal Instructions · Town of Lauderdale-by-the-Sea: STEP 6 Building Permit Inspections · Town of Lauderdale-by-the-Sea: Elevation Certificate Info · Town of Lauderdale-by-the-Sea: TownTopics, April-June 2013 · Florida Building Code 2023, Chapter 16 (UpCodes) · 2023 Florida Building Code excerpts (National Glass Association handout) · Broward BORA Policy #05-05, Building Safety Inspection Program · Florida Statutes s. 553.899 · Florida DEP: Coastal Construction Control Line Program · U.S. Census Bureau ACS 2024 5-year (via Census Reporter) · NOAA/NHC Tropical Cyclone Report: Hurricane Wilma · NOAA/NHC Tropical Cyclone Report: Hurricane Irma