To replace windows in Pompano Beach, measure every opening, pick products with a Miami-Dade NOA or Florida Product Approval, and fill in the Broward Uniform Retrofit Window & Door Schedule. Get your association letter if you have one, apply in Click2Gov, upload plans in ePlan, then pass the attachment and final structural inspections.
Last checked: October 24, 2026 · General guidance. Confirm requirements for your address with the Pompano Beach building department.
Pompano Beach runs permits through two online systems
The first thing that trips people up in Pompano Beach is that a permit lives in two places. Click2Gov is where the permit application number is created and fees are paid. ePlan on Avolve is where the PDF plans are uploaded, review comments are answered, and the approved plans and permit card are downloaded. Each system has its own login.
Paper is still accepted at the counter, but the city scans it and charges scanning fees. Permits are issued by the Department of Development Services, Building Inspections Division, on the 3rd floor of City Hall at 100 West Atlantic Blvd. The main number is (954) 786-4600, and the window and door checklist lists 954-786-4669.
Every window or door that is installed, replaced or given a major repair needs a permit here, on homes and commercial buildings. Replacing a part that does not change the product's approval does not. Shutters need their own permit.
- Click2Gov: c2g.pompanobeachfl.gov (application number and fees)
- ePlan on Avolve: pompanobeach-fl-us.avolvecloud.com (plans, comments, permit card)
- The city also posts a Building Department Fee Schedule and an online Permit Fee Estimator
First, figure out what kind of Pompano Beach home you have
Pompano Beach is not mostly single-family houses. Of 61,070 housing units, about 29% are detached houses and about 4% townhomes, while about 30% sit in buildings with 50 or more units. The steps below change depending on which group you are in.
The housing is also old. The median home was built in 1974, and about 82% of units date from before 1990. Those windows went in long before the current Florida Building Code, 8th Edition (2023), which took effect December 31, 2023. Every replacement window is judged by today's rules, not the rules the building was built under.
| Your home | How design pressure is set | Extra paperwork | Owner/builder allowed? |
|---|---|---|---|
| Detached house or townhouse, roof under 30 ft | One of three paths under BORA Formal Interpretation #24 | HOA approval letter if you have an HOA | Yes, under F.S. 489.103 |
| Condo unit in a building with mean roof height over 30 ft | Site-specific loads signed and sealed by a Florida engineer or architect | Association approval letter | No, not in condominiums |
The code rules that apply to a Pompano Beach window
Broward County and Miami-Dade make up the Florida Building Code's High-Velocity Hurricane Zone (HVHZ), the strictest wind section of the state code. That is why the city asks for a current Miami-Dade Notice of Acceptance (NOA) or Florida Product Approval for every product, with each element that applies circled or clouded on the document.
Wind speed matters too. On the ASCE 7-22 map used by the 2023 code, Pompano Beach sits between the 160 mph and 170 mph lines, with the 170 mph line running just offshore. Homes closer to the ocean land nearer the high end. The exact number for your lot is set by the engineer or the building department.
The local storm record shows why. During Wilma in 2005, the National Weather Service logged a 98 mph peak gust in Pompano Beach before records were cut short by instrument failure. During Irma in 2017, the Pompano Beach station recorded an 88 mph peak gust before its anemometer failed.
- Under 30 ft mean roof height, BORA FI #24 gives three ways to set design pressure: a signed-and-sealed site-specific plan, an unsealed plan plus a sealed worst-case pressure chart, or an unsealed plan using the Broward County Fenestration Voluntary Wind Load Chart
- Over 30 ft, generic charts alone are not accepted; loads must be signed and sealed by a Florida engineer or architect
- A Florida engineer or architect may modify the buck or fasteners shown in an NOA, with a signed and sealed letter or drawing
Step by step: replacing windows in Pompano Beach
- 1. Measure every opening and give it an ID. Write down width and height in inches for each window and door, plus which wall it is on. Note whether it sits near a corner, because the Broward chart uses zone 4 for the field of the wall and zone 5 near corners. Note existing shutters and any mullions between units.
- 2. Find your mean roof height. This one number decides your path. Under 30 ft, the Broward Voluntary Wind Load Chart can be used. Over 30 ft, common in Pompano Beach condo towers, you need sealed site-specific loads.
- 3. Choose products whose approval covers each opening. Match each opening to an NOA or Florida Product Approval whose size and rated design pressure meet or beat what the chart or engineer requires. Circle or cloud the parts of the approval that apply.
- 4. Fill in the Broward Uniform Retrofit Window & Door Schedule. Pompano Beach requires this form (BORA Policy 20-01). For each opening it lists the ID, approval number, rated and required design pressure in plus and minus psf, size, area, wall zone, whether the glass is impact, existing shutters, new shutters required and mullion tubes required.
- 5. Get the association letter. If you live in a condo or an HOA community, the city requires an association approval letter for the scope of work with the permit application. Ask early, because the board decides on its own schedule.
- 6. Check for a catwalk. If a door opens onto a catwalk, the door in any position may not cut the required walkway width by more than half. If the existing door already encroaches, the city wants a photo of it.
- 7. Apply in Click2Gov, upload in ePlan. Submit the Broward County Uniform Permit Application with Building checked, the approvals, a plan showing the location, size and type of each product, the wind load chart and the retrofit schedule. The Fire Review Application is not needed for single-family homes. Owner/builders add the Owner/Builder Statement Affidavit.
- 8. Record the Notice of Commencement. When the contract price is more than $5,000, a Notice of Commencement is required. Record it with Broward County, then submit a copy with the application or keep it on site for the first inspection.
- 9. Wait for issuance before any work. The city reviews Building, Electrical, Mechanical and Plumbing at the same time, plus outside agencies when needed. The permit is issued electronically after fees are paid. Work cannot start before then.
- 10. Installation day and the two inspections. Keep the approved plans and permit card on site. A window or door permit gets a BLDG ATTACHMENT inspection and a BLDG FINAL STRUCTURAL inspection, plus a Fire Department Final where a fire permit applies. Both can be scheduled and tracked online.
- 11. Close the permit and book the wind mitigation inspection. After the final passes, keep the permit record and product approvals together. A wind mitigation inspection on form OIR-B1-1802 can then document your opening protection for your insurer.
East of A1A, near the canals and the Inlet
Pompano Beach has about 3 miles of beach running north to the Hillsboro Inlet. The city treats properties east of State Road A1A as a coastal zone with more flood risk from waves and storm surge. Per the city, FEMA maps place over 32% of buildings in a Special Flood Hazard Area, and the whole city can be considered flood prone.
The Pompano Canal and Cypress Creek Canal drain into the Intracoastal, and many waterways are tidal, so heavy rain at high tide can back up the storm drains. Before you plan door work at grade, look up your zone (AE, AH, VE or X appear on the city's form) with the city's online flood zone lookup.
Condo owners: a short checklist
Pompano Beach enforces Broward's Building Safety Inspection Program for buildings 25 years or older, with a re-inspection every 10 years. State law (F.S. 553.899) separately requires milestone inspections of condo and co-op buildings three or more habitable stories tall. If your building is in one of these cycles, your board may have rules or timing for window work.
- Ask the association for its window and door specifications and its approval letter
- Confirm the building's mean roof height; over 30 ft means sealed engineering
- Owner/builder permits are not allowed in condominiums, so a contractor must apply
- Ask whether the building is in a safety or milestone inspection cycle
If you want to pull the permit yourself
Pompano Beach allows owner/builder permits for houses under F.S. 489.103. You must appear in person and sign, supervise the work on site yourself, and the home must be for your own use. If you sell or lease it within 1 year of completion, the law presumes it was built for sale or lease.
What changes the cost of a Pompano Beach job
This page does not list prices. For product prices in Pompano Beach, see windowsstockmarket.com/impact-window-prices-pompano-beach-fl. What moves the number here:
- Roof height: sealed site-specific engineering above 30 ft adds a cost a house under 30 ft may not need
- Wall zone: openings near corners (zone 5) need higher design pressure
- Opening size and the number of sliding or entry doors
- Glass and frame choices your association requires
- Mullion tubes and buck changes listed on the retrofit schedule
Getting help with a Pompano Beach project
Vieser Construction is an authorized installer for ESW, Mr. Glass and PGT. Permit assistance is available. Our team coordinates the complete permitting process, including required documentation, engineering and permit submission, when applicable.
We coordinate your complete installation from measurement to final inspection. For in-stock projects, materials typically arrive 2–3 weeks after contract. Call or text (754) 707-3281 with your address and opening count.
Pompano Beach window replacement questions
Why do I need two logins to get a window permit in Pompano Beach?
The city splits the work. Click2Gov creates the permit application number and takes fee payments. ePlan on Avolve is where plans are uploaded, review comments are answered, and the approved plans and permit card are downloaded. The two systems use separate logins.
What is the Broward Uniform Retrofit Window & Door Schedule, and does Pompano Beach require it?
Yes, Pompano Beach requires it. It is a one-page table (BORA Policy 20-01) listing each opening's ID, product approval number, rated and required design pressures, size, area, wall zone, impact glass, existing and new shutters, and mullion tubes.
My Pompano Beach condo building is over 30 feet tall. What changes?
Above 30 feet of mean roof height, the generic Broward wind load chart is not enough. Design wind loads must be site-specific and signed and sealed by a Florida engineer or architect. You also need the association approval letter, and owner/builder permits are not allowed in condominiums.
What inspections will a Pompano Beach window permit get?
Two building inspections: BLDG ATTACHMENT and BLDG FINAL STRUCTURAL. Where a fire permit applies, there is also a Fire Department Final. You can schedule and track them online, and the approved plans and permit card must be on site.
Do I need a Notice of Commencement for windows in Pompano Beach?
Yes, when the contract price is more than $5,000. Record it with Broward County. You can submit a copy with the permit application or keep it on the job site for the first inspection.
Can Vieser help with the Pompano Beach permit?
Yes. Permit coordination is available for qualifying projects. Our team manages the required documentation, engineering coordination and submission process from start to finish. Call or text (754) 707-3281 with your address and the number of openings.
Related
Replacing windows in Pompano Beach? We coordinate your complete installation from measurement to final inspection.
Call (754) 707-3281 or request an estimate.
Sources: City of Pompano Beach – Window/Door/Shutter Checklist (updated 01/29/2024) · City of Pompano Beach – Shutters Checklist · City of Pompano Beach – Apply for a New Permit · City of Pompano Beach – Building Inspections Resources · Broward BORA Formal Interpretation #24 and Fenestration Wind Load Chart · Broward County Uniform Retrofit Window & Door Schedule · City of Pompano Beach – Owner Builder Statement/Affidavit · City of Pompano Beach – Flood Information · City of Pompano Beach – Flood Zone Information form · City of Pompano Beach – Building Safety Inspection Program · Florida Statutes s. 553.899 · Florida Building Commission · Florida Building Code (HVHZ summary) · UF GeoPlan – ASCE 7-22 wind speed contours · U.S. Census Bureau ACS 2020-2024, B25034 (via Census Reporter) · U.S. Census Bureau ACS 2020-2024, B25024 (via Census Reporter) · National Weather Service Miami – Hurricane Wilma · National Weather Service Miami – Hurricane Irma · Pompano Beach, Florida (Wikipedia)
Related pages
Impact windows in Pompano Beach: local rules and installation