To replace windows in Plantation, choose HVHZ-approved impact products for every opening, fill out the Broward County Uniform Retrofit Window & Door Schedule, and get a permit from the City of Plantation Department of Building Safety through its Citizen Access portal. Then install, pass inspection, close the permit and book a wind mitigation inspection.
Last checked: October 24, 2026 · General guidance. Confirm requirements for your address with the Plantation building department.
What makes a Plantation window job different
Plantation sits inland, west of Fort Lauderdale, with no ocean or Intracoastal frontage. Many owners assume that means lighter rules. It does not. The whole city is in Broward County, and Broward and Miami-Dade are the only two counties in Florida's High-Velocity Hurricane Zone (HVHZ).
Three other things shape a Plantation project: most homes were built in the 1980s, the city runs a same-day permit program for window and door jobs on existing single-family homes, and many residents live in condo buildings with their own rules.
| Item | What applies in Plantation |
|---|---|
| Wind zone | HVHZ (all of Broward County) |
| Design wind speed, typical home (Risk Category II) | 170 mph, 3-second gust (FBC Section 1620.2) |
| Permit office | City of Plantation Department of Building Safety |
| Online portal | Citizen Access (apply, schedule inspections, check status) |
| Required county form | Broward County Uniform Retrofit Window & Door Schedule (BORA Policy 20-01) |
| Median year homes were built | 1984 |
| Building Safety contacts | 954-797-2765 (main), 954-678-2632 (inspections), Helpmebuilding@plantation.org |
Most Plantation homes are from the 1980s. Here is why that matters
Census data puts the median year built in Plantation at 1984. The 1980s were the city's biggest building decade, followed by the 1970s and 1990s. About 86% of homes were built before 2000, and only about 14% in 2000 or later.
That timing is important. Hurricane Andrew hit in 1992, and it led to the first statewide Florida Building Code, which took effect in 2002 and kept the stricter HVHZ rules for Broward and Miami-Dade. So most Plantation homes were built before today's impact rules existed. Their original windows were never tested against the large-missile and pressure standards that new windows must pass now.
Each new unit has to meet current HVHZ requirements and be installed exactly as its approval says. Openings in a house built around 1984 can be out of square or have worn framing. Find that when you measure, not on installation day.
Start with your type of home
The path to new windows changes with the type of building you live in.
- Single-family house (about 48% of homes): the most direct path. Existing single-family homes can use the city's Same Day Permit Services for a standalone window or door permit. Plantation Acres, on the west side in ZIP 33323, has large lots, many around one acre.
- Townhome (about 8% of homes): check your HOA's exterior rules before you pick a frame color or glass tint. Fee-simple townhouses are exempt from Broward's building safety inspection program.
- Condo or apartment building (about 32% of homes are in buildings with 10 or more units): the association's rules and approvals come first. Plantation does not allow owner-builder permits for condos.
- Rental property (about 33% of occupied homes): the owner, or someone the owner authorizes, applies.
Step by step: replacing windows in a Plantation home
- 1. Measure every opening. Record the width and height of each window and door opening, give each one an ID, and note damaged framing, out-of-square openings or old shutter hardware. The IDs carry onto the county retrofit schedule.
- 2. Check HOA or condo rules. Some Plantation communities have their own architectural review. Plantation Lakes, for example, publishes ARC Design Guidelines for exterior changes. Get the association's written approval of frame color, glass and style before you order.
- 3. Choose products with an HVHZ approval. Every window and door needs a Miami-Dade Notice of Acceptance (NOA) or a Florida Product Approval whose Limits of Use say it is approved for the HVHZ. Not every Florida approval qualifies. Look up the number on floridabuilding.org before you buy.
- 4. Match each opening to its design pressure. Each opening has a required design pressure based on its size and location on the house. The product's approved pressure rating must meet or beat it. Both numbers go on the retrofit schedule.
- 5. Build the permit package. The package includes the Broward County Uniform Retrofit Window & Door Schedule, the product approvals and every item on the city's Window/Door Checklist (see below).
- 6. Apply through Citizen Access. Plantation's permits run through the Citizen Access portal. Only contractor accounts or accounts registered and activated by the Department of Building Safety can submit applications or schedule inspections. Registration needs a notarized Web User Declaration and takes about 1 to 2 business days.
- 7. Record the Notice of Commencement. Under s. 713.135, Florida Statutes, a certified copy of a recorded Notice of Commencement must be filed with the permit office before the first inspection when the direct contract is above the state threshold. That threshold was raised in 2023, so the figure on Plantation's 2019 checklist is out of date.
- 8. Installation day. Old units come out, openings are prepared, and each new unit is anchored per its approval. Keep the permit and approval documents on site for the inspector.
- 9. Schedule and pass inspections. Inspections are scheduled through Citizen Access or the inspection line at 954-678-2632, and results show in the portal. Pass the inspections listed on your permit until it reaches final.
- 10. Close the permit and book a wind mitigation inspection. Confirm in Citizen Access that the permit is finaled. Then book a wind mitigation inspection on form OIR-B1-1802, which can document opening protection for your insurer.
Plantation's Wednesday same-day window permit
Plantation offers Same Day Permit Services that cover window/door and shutter permits. It is a real time saver, but the rules are strict.
- Existing single-family residential properties only. Condos and new construction do not qualify.
- Submit through Citizen Access on Wednesdays between 6 a.m. and 9 a.m.
- Limit of 5 submittals per applicant or contractor.
- The permit must be standalone. Do not bundle the windows with a roof or other work.
- The package must include every item on the city's Window/Door Checklist (or the Shutters Checklist for shutters). A missing item takes it out of the same-day track.
Permit package checklist for Plantation
Check this list before anything is submitted. It draws on Broward's Board of Rules and Appeals and Plantation's Permit Submittal Checklist.
- Broward County Uniform Retrofit Window & Door Schedule (BORA Policy 20-01, revised 04/11/2024), required on every window and door retrofit permit in Broward.
- For each opening on the schedule: opening ID, product approval number, approved pressure rating, required design pressure, size, wind zone, impact glazing, shutters and mullions.
- Product approval (NOA or HVHZ-approved Florida Product Approval) for each window, door, garage door or shutter.
- Contractor registration with the City, plus general liability and workers' compensation certificates naming the City of Plantation as certificate holder.
- Owner-builders only: proof of ownership, primary residence or homestead property, a meeting with the division chief for each trade, and personal supervision on site.
- Recorded Notice of Commencement before the first inspection, when the contract amount requires it.
Condos and associations in Plantation
About 18% of Plantation's homes are in buildings of 50 or more units. If you live in one, your window choices usually follow the association's specification, and the association may have to approve the work first.
Florida's milestone inspection law (s. 553.899, F.S.) covers condo and co-op buildings three or more stories tall, with the first inspection due by December 31 of the year the building turns 30, then every 10 years. Broward's Building Safety Inspection Program (BORA Policy 05-05) also inspects non-exempt buildings 30 years or older. Ask your board whether window work is tied to a recent report.
Storms, flood zones and timing your project
About 10% of Plantation's land is in a FEMA flood zone, and the city says heavy rain from hurricanes and tropical storms is its greatest flood risk. Broward's updated FEMA flood maps took effect July 31, 2024, so check your zone again. Use Broward County's flood map, request a map determination letter from City Engineering at 954-797-2282, or print a free FEMA FIRMette.
Much of the city drains through the Old Plantation Water Control District, which runs about 36 miles of waterways and four major pumping stations. That system moves rainwater; it does nothing for your openings in high wind.
Hurricane Wilma, on October 24, 2005, was called the most damaging storm to hit the Fort Lauderdale area since 1950. For in-stock projects, materials typically arrive 2–3 weeks after contract, but permit review and HOA approval add time, so do not wait for a storm watch.
What changes the cost of a Plantation project
This page does not list prices. For current impact window prices and whole-home examples in Plantation, see the Windows Stock Market price page for Plantation. These are the things that move the number locally:
- HVHZ products only: there is no lower non-HVHZ option anywhere in Plantation.
- Opening size and design pressure: larger openings and higher required pressures need heavier products and mullions.
- Glass: tint, low-E and laminated glass choices.
- Door count: sliding and French doors cost more per opening than windows, and many 1980s Plantation houses have a patio slider.
- HOA or condo specification: a required color, frame or glass can limit product choice.
- Opening condition: worn or out-of-square framing in older homes may need correction.
- Not part of the product price: permit fees, the recorded Notice of Commencement, the wind mitigation inspection, and any HOA application fee.
Getting help with a Plantation window replacement
Vieser Construction is an authorized installer for ESW, Mr. Glass and PGT. We coordinate your complete installation from measurement to final inspection.
Permit assistance is available. Our team coordinates the complete permitting process, including required documentation, engineering and permit submission, when applicable.
Call or text (754) 707-3281 with your opening count and ZIP code (33317, 33322, 33323 or 33324) to start a written estimate.
Plantation window replacement questions
Do I need a permit to replace windows in Plantation, FL?
Yes. Florida requires a permit for window replacement, and in Plantation it is issued by the Department of Building Safety through the Citizen Access portal. Every Broward window and door retrofit permit must include the Uniform Retrofit Window & Door Schedule listing each opening's product approval and design pressure.
Can I get a window permit the same day in Plantation?
Often, yes, for an existing single-family home. Plantation's Same Day Permit Services accept standalone window/door and shutter permits through Citizen Access on Wednesdays from 6 a.m. to 9 a.m., up to 5 submittals per applicant. Every item on the city's Window/Door Checklist must be included. Condos do not qualify.
Plantation is inland. Do I still need impact windows that meet HVHZ rules?
Yes. All of Broward County is in the High-Velocity Hurricane Zone, inland or not. Typical homes in Broward are designed for a 170 mph, 3-second gust. Products need a Miami-Dade NOA or a Florida Product Approval that lists the HVHZ in its Limits of Use.
Can I pull an owner-builder window permit in Plantation?
Only for your own primary residence or homestead property, and never for a condo. You must show proof of ownership, meet with the division chief for each trade, and personally supervise the work. If you hire workers who lack the required license, you can be liable for their injuries.
Can Vieser Construction handle the Plantation permit for me?
Yes. Permit coordination is available for qualifying projects. Our team manages the required documentation, engineering coordination and submission process from start to finish. In Plantation, applications go through the Citizen Access portal, and every Broward window permit needs the Uniform Retrofit Window & Door Schedule.
My Plantation condo building is from the 1980s. Does that affect my window project?
It can. Condo buildings three or more stories tall need a milestone inspection by the end of the year they turn 30, then every 10 years, and Broward has its own 30-year inspection program. Check the association's window specification and approval rules before ordering. Owner-builder permits are not allowed for condos.
Related
Replacing windows in Plantation? We coordinate your complete installation from measurement to final inspection.
Call (754) 707-3281 or request an estimate.
Sources: 2023 Florida Building Code, Building, 8th Ed., Chapter 16 (HVHZ, Section 1620.2) · Florida Building Commission – Product Approval search · Broward County BORA Policy 20-01, Uniform Retrofit Window & Door Schedule · City of Plantation – Building Safety · City of Plantation – Permit Services (Citizen Access) · City of Plantation – Same Day Permit Services · City of Plantation Permit Submittal Checklist · City of Plantation Owner-Builder Affidavit · Cozen O'Connor – 2023 Florida lien-law amendments (s. 713.135 F.S.) · U.S. Census Bureau ACS 2024 1-year via Census Reporter – Plantation, FL · Wikipedia – Florida Building Code · Plantation Lakes Club – ARC Design Guidelines · Florida Statutes s. 553.899 (milestone inspections) · Draft BORA Policy 05-05, Broward County Building Safety Inspection Program · City of Plantation Engineering – Flood Protection & Preparedness · City of Pembroke Pines – Flood Zone Information (Broward FIRM update) · Old Plantation Water Control District – FAQ · Wikipedia – Effects of Hurricane Wilma in Florida · Wikipedia – Plantation, Florida · Statistical Atlas – ZIP 33323 · Florida Office of Insurance Regulation (form OIR-B1-1802) · Windows Stock Market – Impact window prices in Plantation, FL